Pelaksanaan pembangunan gorang-gorang dan jembatan structure and bridges - engineering
Saved in:
Other Authors: | |
---|---|
Format: | Unknown |
Published: |
Jakarta
Lestari
1980
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000n a2200000 a 4501 | ||
---|---|---|---|
001 | wils-98156 | ||
020 | # | # | |a T000031853 |
090 | 0 | 0 | |a TG260 |b .P45 |b A |b 1980 |
245 | 1 | 1 | |a Pelaksanaan pembangunan gorang-gorang dan jembatan |b structure and bridges - engineering |c disusun oleh Dahimin B.R.E |
260 | # | # | |a Jakarta |b Lestari |c 1980 |
300 | # | # | |a 163 ms. |b il. |c 22 cm |
650 | # | 0 | |a Structural engineering |
650 | # | 0 | |a Bridges |x Design and construction |
700 | 1 | # | |a Dalimin, B R E |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=98156 |
964 | # | # | |c BOK |d 01 |
040 | # | # | |a Shah Alam |
998 | # | # | |a 00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1|| |