Construction Project Scheduling and Control

Bad scheduling can doom a construction project from the start Construction Project Scheduling and Control provides a comprehensive examination of the analytical methods used to devise a reasonable, efficient, and successful schedule for construction projects of all sizes. This updated third edition...

Full description

Saved in:
Bibliographic Details
Main Author: Mubarak. Saleh A. , (Saleh Altayeb) (Author)
Format: Book
Language:English
Published: New York, United States John Wiley 2015
Edition:3rd Edition
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a2200000#i 4501
001 wils-957800
005 202047132322
008 t2015 -US ag# ##001 #beng#D
020 # # |a 9781118846001  |q hardback 
040 # # |a UiTM  |b eng  |c UiTM  |e rda 
041 0 # |a English 
090 0 0 |a TH438.4  |b .M83 2015 
100 1 # |a Mubarak. Saleh A. ,  |e author  |q (Saleh Altayeb) 
245 0 0 |a Construction Project Scheduling and Control  |c Saleh Mubarak. 
250 # # |a 3rd Edition 
264 # 1 |a New York, United States  |b John Wiley  |c 2015 
264 # 4 |c ©2015 
300 # # |a xv, 512 pages  |b illustrations  |c 25 cm 
336 # # |a text  |2 rdacontent 
337 # # |a unmediated  |2 rdamedia 
338 # # |a volume  |2 rdacarrier 
500 # # |a Silibus FSPU (AP776) 
504 # # |a Includes bibliographical references and index 
505 0 # |a Introduction -- Bar (Gantt) charts -- Basic networks -- The critical path method -- Precedence networks -- Resource allocation and resource leveling -- Schedule updating and project control -- Schedule compression and time-cost trade-off -- Reports and presentations -- Scheduling as part of the project management effort -- Other scheduling methods -- Dynamic minimum lag relationship -- Construction delay and other claims -- Schedule risk management -- BIM-based 4D modeling and scheduling. 
520 # # |a Bad scheduling can doom a construction project from the start Construction Project Scheduling and Control provides a comprehensive examination of the analytical methods used to devise a reasonable, efficient, and successful schedule for construction projects of all sizes. This updated third edition contains new information on building image modeling (BIM) and its relationship to project scheduling and control, as well as thorough coverage of the latest developments in the field. Written by a career construction professional, this informative text introduces students to new concepts in CPM scheduling, including the author's own Dynamic Minimum Lag technique. The expanded glossary and acronym list facilitate complete understanding, and the numerous solved and unsolved problems help students test their knowledge and apply critical thinking to issues in construction scheduling. A complete instructor's manual provides solutions to all problems in the book, test questions for each chapter, and additional exam questions for more comprehensive testing 
526 0 # |a AP776  |5 AP 
526 0 # |a Sarjana Sains Pengurusan Projek Pembinaan Bersepadu  |5 Perpustakaan Senibina & Perancangan Ukur 
546 # # |a In English 
650 # # |a Construction industry  |x Management 
650 # # |a Building  |x Superintendence 
650 # # |a Production scheduling 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=957800 
964 # # |c BOK  |d 01 
998 # # |a 00250##a002.5.2||00250##b002.5.3||00264#1a002.8.2||00264#1b002.8.4||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||00500##a002.17.2||00520##a007.2||00520##b007.2||00546##a006.11||