WASTEWATER TREATMENT PLANTS PLANNING, DESIGN, AND OPERATION
Step-by-step procedures for planning, design, construction and operation: * Health and environment * Process improvements * Stormwater and combined sewer control and treatment * Effluent disposal and reuse * Biosolids disposal and reuse * On-site treatment and disposal of small flows * Wastewa...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Language: | English |
Published: |
Bosa Roca, United States
CRC Press
1999
|
Edition: | Print book : English : 2nd edition |
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a2200000#i 4501 | ||
---|---|---|---|
001 | wils-957726 | ||
005 | 202036163357 | ||
008 | t1999 -US ag# ##001 #beng#D | ||
020 | # | # | |a 9781566766883 |q hardback |
040 | # | # | |a OCLC |b emg |c OCLC |d UiTM |e rda |
041 | 0 | # | |a English |
090 | 0 | 0 | |a TD746 |b .S94 1999 |
100 | 1 | # | |a Syed R. Qasim |e author |
245 | 0 | 0 | |a WASTEWATER TREATMENT PLANTS |b PLANNING, DESIGN, AND OPERATION |c SYED R. QASIM, |
250 | # | # | |a Print book : English : 2nd edition |
264 | # | 1 | |a Bosa Roca, United States |b CRC Press |c 1999 |
264 | # | 4 | |c ©1999 |
300 | # | # | |a xix, 1107 pages |b illustrations |c 24 cm |
336 | # | # | |a text |2 rdacontent |
337 | # | # | |a unmediated |2 rdamnedia |
338 | # | # | |a volume |2 rdacarrier |
500 | # | # | |a Silibus Silibus FKA (EC704) Mesy. 3 2020 |
504 | # | # | |a Includes bibliographical references and index |
520 | # | # | |a Step-by-step procedures for planning, design, construction and operation: * Health and environment * Process improvements * Stormwater and combined sewer control and treatment * Effluent disposal and reuse * Biosolids disposal and reuse * On-site treatment and disposal of small flows * Wastewater treatment plants should be designed so that the effluent standards and reuse objectives, and biosolids regulations can be met with reasonable ease and cost. The design should incorporate flexibility for dealing with seasonal changes, as well as long-term changes in wastewater quality and future regulations. Good planning and design, therefore, must be based on five major steps: |
526 | 0 | # | |a EC704 |b ECW 753 |5 EC |
526 | 0 | # | |a SARJANA SAINS ALAM SEKITAR |b ADVANCED WASTEWATER TREATMENT TECHNOLOGY |5 FAKULTI KEJURUTERAAN AWAM |
546 | # | # | |a In English |
650 | # | # | |a Sewage disposal plants |
650 | # | # | |a Abwasserreinigung |
650 | # | # | |a Pflanzen |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=957726 |
964 | # | # | |c BOK |d 01 |
998 | # | # | |a 00250##a006.11||00250##b006.11||00264#1a006.11||00264#1b006.11||00300##a006.11||00300##b006.11||00300##c006.11||00500##a006.11||00520##a006.11||00520##b006.11||00546##a006.11|| |