THE DETERMINATION OF LABOUR CONSTANT (PRODUCTIVITY INDEX) FOR CONSTRUCTION PROCESS - FORMWORK-

Saved in:
Bibliographic Details
Main Author: ROSLAN PAINUDY (Author)
Format: Thesis
Published: SHAH ALAM, SELANGOR MARA INSTITUTE OF TECHNOLOGY. CIVIL ENGINEERING 1991
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-948767
005 201978152541
100 0 # |a ROSLAN PAINUDY  |e author 
245 1 4 |a THE DETERMINATION OF LABOUR CONSTANT (PRODUCTIVITY INDEX) FOR CONSTRUCTION PROCESS - FORMWORK-  |c ROSLAN PAINUDY 
264 # 1 |a SHAH ALAM, SELANGOR  |b MARA INSTITUTE OF TECHNOLOGY. CIVIL ENGINEERING  |c 1991 
500 # # |a UiTM X Digitization 
502 # # |a Student report (Dip.)-MARA INSTITUTE OF TECHNOLOGY. CIVIL ENGINEERING, 1991 
040 # # |a Shah Alam 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=948767 
998 # # |a 00264#1a006.11||00264#1b006.11||00500##a006.11||00502##a006.11||