TIME STUDY FOR THE ASSEMBLY OF CITROEN MODEL BX19 GT
Saved in:
Main Author: | SARIDAH KASMURI (Author) |
---|---|
Format: | Thesis |
Published: |
SHAH ALAM, SELANGOR
MARA INSTITUTE OF TECHNOLOGY. SCHOOL OF ENGINEERING
1991
|
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ECOTOURISM IN THE IMT-GT REGION issues and challenges
Published: (2006) -
The GT guide to world equity markets
Published: (1986) -
The GT guide to world equity markets 1987
Published: (1987) -
Indonesia-Malaysia-Singapore growth triangle (IMS-GT)
Published: (1997) -
Time study on a BMW assembly line a case study
by: Mohd Fadhir Akhkar Ali
Published: (1996)