PROPOSED UPGRADING WORK OF SULTAN AZLAN SHAH AIPORT TERMINAL BUILDING FOR MALAYSIA AIRPORT HOLDING BERHAD AT JALAN LAPANGAN TERBANG 31350 IPOH, PERAK

A lot of procedures and process have to be done before this report is complete. Every detail from every aspect have to be exact and compile together. This report must cover all aspect such as the layout plan, traffic flow inside the terminal and lot of other aspect.

Saved in:
Bibliographic Details
Main Author: Mohamed Asyraff Mohamed Redzuan (Author)
Format: Thesis Book
Language:English
Published: Perak UNIVERSITI TEKNOLOGI MARA. FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING 2011
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items