PROPOSED UPGRADING WORK OF SULTAN AZLAN SHAH AIPORT TERMINAL BUILDING FOR MALAYSIA AIRPORT HOLDING BERHAD AT JALAN LAPANGAN TERBANG 31350 IPOH, PERAK
A lot of procedures and process have to be done before this report is complete. Every detail from every aspect have to be exact and compile together. This report must cover all aspect such as the layout plan, traffic flow inside the terminal and lot of other aspect.
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
Perak
UNIVERSITI TEKNOLOGI MARA. FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING
2011
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|