MAINTENANCE RESPONSE TIME IN PUBLIC BUILDING

Currently, in public building we can see that the main problem in the maintenance management is the response time of the maintenance or feedback when to attend the complaint.

Saved in:
Bibliographic Details
Main Author: Noormahadil Mahari (Author)
Format: Thesis Book
Language:English
Published: Shah Alam, Selangor UNIVERSITI TEKNOLOGI MARA. FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING 2008
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a2200000#i 4501
001 wils-923304
005 2018330123625
008 180430s2008 MY ag# t#000 ##eng#D
040 # # |a UiTM  |c UiTM  |e rda 
041 0 # |a eng 
090 0 0 |a TH3301  |b .N66 2008 
100 0 # |a Noormahadil Mahari  |e author 
245 1 0 |a MAINTENANCE RESPONSE TIME IN PUBLIC BUILDING  |c NOORMAHADIL MAHARI 
264 # 1 |a Shah Alam, Selangor  |b UNIVERSITI TEKNOLOGI MARA. FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING  |c 2008 
300 # # |a vi, 94 pages (various pagings)  |b illustrations  |c 30 cm 
336 # # |a text  |2 rdacontent 
337 # # |a unmediated  |2 rdamedia 
338 # # |a volume  |2 rdacarrier 
500 # # |a UiTM X Digitization 
502 # # |a Student report (BSc.) - Universiti Teknologi MARA. Faculty Of Architecture, Planning And Surveying, 2008 
504 # # |a Includes bibliographical references 
520 # # |a Currently, in public building we can see that the main problem in the maintenance management is the response time of the maintenance or feedback when to attend the complaint. 
650 # 0 |a Buildings  |x Maintenance 
710 2 # |a Faculty Of Architecture, Planning And Surveying  |e issuing body 
710 2 # |a Fakulti Senibina, Perancangan dan Ukur  |e issuing body 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=923304 
998 # # |a 00264#1a002.8.2||00264#1b002.8.4||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||00500##a002.17.2||00502##a007.9.2||00520##a007.2||00520##b007.2||