IN SEWER PROCESSES: ESTABLISHING HALF SATURATION CONSTANT FOR NITRATE (Kno3)
Saved in:
Main Author: | SITI AMINAH ABU BAKAR (Author) |
---|---|
Format: | Manuscript Book |
Language: | English |
Published: |
Shah Alam, Selangor
Universiti Teknologi MARA. Faculty of Civil Engineering
2002
|
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ESTABLISHING HALF SATURATION CONSTANT FOR NITRITE (Kno2)
by: SITI MAIZURAH MISUAN
Published: (2002) -
IN-SEWER PROCESSES: ESTABLISHING NITRATE UTILIZATION RATE IN BULK WATER UNDER ANOXIC CONDITION-FOR LOW NITRATE CONCENTRATION
by: ZALBISHAH RUSLI
Published: (2002) -
IN-SEWER PROCESSES: ESTABLISHING NITRATE UTILIZATION RATE IN BULK WATER UNDER ANOXIC CONDITION WITH HIGH INITIAL NITRATE CONCENTRATION
by: MURNI AZURA IBRAHIM
Published: (2002) -
Sewer processes microbial and chemical process engineering of sewer networks
by: Hvitved-Jacobsen, Thorkild
Published: (2002) -
IN-SEWER PROCESSES: ANOXIC PROCESSES
by: MOKHTAR SHAHARUDDIN
Published: (2002)