Building Contract Claims

Many building projects are the subject of claims - the assertion of a right, usually by the contractor, to an extension of the contract period or an additional payment under the terms of the building contract. Many of these claims are unsound or ill-founded, often because the basic principles are mi...

Full description

Saved in:
Bibliographic Details
Main Author: Chappell, David (Author)
Format: Book
Language:English
Published: Oxford Wiley-Blackwell 2011
Edition:Fifth Edition
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000cam#a2200000#i#4501
001 wils-464288
005 2019127103054
008 200219t20112011XXK #g# ##001 |#eng#D
020 # # |a 9780470657386  |q hardback 
020 # # |a 0470657383  |q hardback 
040 # # |a DLC  |b eng  |c DLC  |d UiTM  |e rda 
041 0 # |a eng 
090 0 0 |a KD1641  |b .C43 2011 
100 1 # |a Chappell, David  |e author 
245 1 0 |a Building Contract Claims  |c David Chappell 
250 # # |a Fifth Edition 
264 # 1 |a Oxford  |b Wiley-Blackwell  |c 2011 
264 # 4 |c ©2011 
300 # # |a xii, 532 pages  |c 25 cm 
336 # # |a text  |2 rdacontent 
337 # # |a unmediated  |2 rdamedia 
338 # # |a volume  |2 rdacarrier 
504 # # |a Includes bibliographical references and index 
520 # # |a Many building projects are the subject of claims - the assertion of a right, usually by the contractor, to an extension of the contract period or an additional payment under the terms of the building contract. Many of these claims are unsound or ill-founded, often because the basic principles are misunderstood. This highly regarded book examines the legal basis of claims for extensions of time and additional payment, and what can and cannot be claimed under the main forms of contract. It includes chapters dealing with direct loss and expense, liquidated damages, extension of time, concurrency. 
526 0 # |a BCT683  |b AP256  |5 AP 
526 0 # |a Construction Legal Practice  |b Bachelor of Science (Construction Technology)  |5 Faculty of Architecture, Planning and Surveying 
650 # 0 |a Damages  |z England 
650 # 0 |a Construction contracts  |z England 
650 # 0 |a Breach of contract  |z England 
650 # 0 |a Actions and defenses  |z England 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=464288 
964 # # |c D40  |d AP