Modern construction lean project delivery and integrated practices
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Unknown |
Published: |
Boca Raton, FL
CRC Press
2011
|
Series: | Industrial innovation series.
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000n a2200000 a 4501 | ||
---|---|---|---|
001 | wils-449367 | ||
020 | # | # | |a 9781420063127 (hardback) |
020 | # | # | |a 142006312X (hardback) |
040 | # | # | |a DLC |d ITMB |
090 | 0 | 0 | |a TH145 |b .F67 2011 |
100 | 1 | # | |a Forbes, Lincoln H. |
245 | 1 | 0 | |a Modern construction |b lean project delivery and integrated practices |c Lincoln H. Forbes, Syed M. Ahmed |
260 | # | # | |a Boca Raton, FL |b CRC Press |c 2011 |
300 | # | # | |a xxxiv, 490 p. |b ill. |c 27 cm |
490 | 1 | # | |a Industrial innovation series |
504 | # | # | |a Includes bibliographical references and index. |
650 | # | 0 | |a Construction industry |x Management |
650 | # | 0 | |a Building |
650 | # | 0 | |a Construction industry |x Cost control |
650 | # | 0 | |a Project management |x Cost control |
650 | # | 0 | |a Lean manufacturing |
700 | 1 | # | |a Ahmed, Syed M. |d 1960- |q Syed Mahmood |
830 | # | 1 | |a Industrial innovation series. |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=449367 |
964 | # | # | |c BOK |d AP |
998 | # | # | |a 00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1|| |