Liquidated damages and extensions of time in construction contracts
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
Chichester, U.K.
Wiley-Blackwell Pub.
2009
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000n a2200000 a 4501 | ||
---|---|---|---|
001 | wils-405970 | ||
020 | # | # | |a 9781405118156 (hardback) |
020 | # | # | |a 1405118156 (hardback) |
040 | # | # | |a DLC |d ITMB |
090 | 0 | 0 | |a KD1641 |b .E34 2009 |
100 | 1 | # | |a Eggleston, Brian |
245 | 1 | 0 | |a Liquidated damages and extensions of time in construction contracts |c Brian Eggleston |
260 | # | # | |a Chichester, U.K. |b Wiley-Blackwell Pub. |c 2009 |
300 | # | # | |a viii, 394 p. |c 25 cm |
500 | # | # | |a Includes index |
650 | # | 0 | |a Damages |z England |
650 | # | 0 | |a Time (Law) |z England |
650 | # | 0 | |a Performance (Law) |z England |
650 | # | 0 | |a Construction contracts |z England |
650 | # | 0 | |a Breach of contract |z England |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=405970 |
964 | # | # | |c D40 |d 01 |
998 | # | # | |a 00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##c003.5.1||00500##a002.17.2|| |