Faster construction projects with CPM scheduling

Saved in:
Bibliographic Details
Main Author: Woolf, Murray B.
Format: Unknown
Published: New York McGraw Hill 2007
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-359580
020 # # |a 0071486607 (alk. paper) 
020 # # |a 9780071486606 (alk. paper) 
040 # # |a DLC  |d ITMB 
090 0 0 |a TH438.4  |b .W65 2007 
100 1 # |a Woolf, Murray B. 
245 1 0 |a Faster construction projects with CPM scheduling  |c Murray B. Woolf 
260 # # |a New York  |b McGraw Hill  |c 2007 
300 # # |a xliii, 412 p.  |b ill.  |c 25 cm 
500 # # |a Includes index 
650 # 0 |a Critical path analysis 
650 # 0 |a Production scheduling  |x Superintendence 
650 # 0 |a Building  |x Superintendence 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=359580 
964 # # |c BOK  |d 01 
998 # # |a 00260##a002.17.2||00260##b002.17.2||00260##c002.17.2||00300##a002.17.2||00300##b002.17.2||00300##c002.17.2||00500##a002.17.2||