Faster construction projects with CPM scheduling
Saved in:
Main Author: | |
---|---|
Format: | Unknown |
Published: |
New York
McGraw Hill
2007
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000n a2200000 a 4501 | ||
---|---|---|---|
001 | wils-359580 | ||
020 | # | # | |a 0071486607 (alk. paper) |
020 | # | # | |a 9780071486606 (alk. paper) |
040 | # | # | |a DLC |d ITMB |
090 | 0 | 0 | |a TH438.4 |b .W65 2007 |
100 | 1 | # | |a Woolf, Murray B. |
245 | 1 | 0 | |a Faster construction projects with CPM scheduling |c Murray B. Woolf |
260 | # | # | |a New York |b McGraw Hill |c 2007 |
300 | # | # | |a xliii, 412 p. |b ill. |c 25 cm |
500 | # | # | |a Includes index |
650 | # | 0 | |a Critical path analysis |
650 | # | 0 | |a Production scheduling |x Superintendence |
650 | # | 0 | |a Building |x Superintendence |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=359580 |
964 | # | # | |c BOK |d 01 |
998 | # | # | |a 00260##a002.17.2||00260##b002.17.2||00260##c002.17.2||00300##a002.17.2||00300##b002.17.2||00300##c002.17.2||00500##a002.17.2|| |