Tunnelling a decade of progress - GeoDelft 1995-2005
Following years of research, the first bored tunnel in soft soil in the Netherlands, the Tweede Heinenoord tunnel, was completed in 1998. Since then, Dutch engineers have increased their knowledge of soft soil tunnelling, with a significant and important part of this research being carried out by Ge...
Saved in:
Corporate Author: | GeoDelft |
---|---|
Other Authors: | Bezuijen, A, Lottum, H. van |
Format: | Book |
Published: |
London
Taylor & Francis
2006
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FARO
Published: (2003) -
MVRDV works and projects, 1991-2006
by: Costanzo, Michele
Published: (2006) -
Studio Boot
by: Studio Boot (Firm)
Published: (2007) -
Mattmo
Published: (2002) -
Dietwee new Dutch graphic design.
Published: (2002)