nec3 engineering and construction short contract Guidance notes and flow charts

These guidance notes explain the provisions of the Short Contract package through its three stages, how an Employer invites tenders, how a tender makes an offer and how a contract is made. Notes are then provided on the clauses and methods of joining diputes with main contract disputes. Worked exa...

Full description

Saved in:
Bibliographic Details
Main Author: NEC (New Engineering Contract) (Author)
Corporate Author: Institution of Civil Engineers (Great Britain)
Format: Book
Language:English
Published: Glasgow, UK OGC 2005
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000cam#a2200000#i#4501
001 wils-339039
005 202227145534
020 # # |a 0727733737  |q paperback 
020 # # |a 9780727733733  |q paperback 
040 # # |a DLC  |b eng  |c DLC  |d UiTM  |e rda 
041 0 # |a eng 
090 0 0 |a KD1641  |b .E54 2005 
100 1 # |a NEC (New Engineering Contract)  |e author 
245 0 0 |a nec3  |b engineering and construction short contract Guidance notes and flow charts  |c NEC (New Engineering Contract) 
246 0 0 |a Guidance notes and flow charts for the engineering and construction short contract 
264 # 1 |a Glasgow, UK  |b OGC  |c 2005 
300 # # |a 86 pages  |b illustrations  |c 30 cm 
336 # # |a text  |2 rdacontent 
337 # # |a unmediated  |2 rdamedia 
338 # # |a volume  |2 rdacarrier 
500 # # |a The NEC3 engineeering and construction short contract is an alternative to NEC3 engineeering and construction and is for use with contracts which do not require sophisticated management techniques, comprise straightforward work and impose only low risks on both the employer and the contractor 
520 # # |a These guidance notes explain the provisions of the Short Contract package through its three stages, how an Employer invites tenders, how a tender makes an offer and how a contract is made. Notes are then provided on the clauses and methods of joining diputes with main contract disputes. Worked examples are provided of the contract data forms.The second part of the book contains flow charts which set out the procedural logic of the 28 clauses that can be presented with benefit by flow charting. 
650 # 0 |a Civil engineering contracts  |z Great Britain 
710 1 # |a Institution of Civil Engineers (Great Britain) 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=339039 
964 # # |c D40  |d 01 
998 # # |a 00130##a006.2.2||00250##a002.5.2||00250##b002.5.3||00255##a007.25.3||00260##a002.17.2||00260##b002.17.2||00260##c002.17.2||00264#1a002.8.2||00264#1b002.8.4||00300##a002.17.2||00300##b002.17.2||00300##c002.17.2||00500##a002.17.2||00502##a007.9.2||00520##a007.2||00520##b007.2||00538##a003.16.9||00546##a006.11||00730##a006.2.2||00730##d006.4||00730##f006.10||00730##n006.2.2||00730##p006.2.2||