Conditions of contract for EPC/turnkey projects

Saved in:
Bibliographic Details
Corporate Author: International Federation of Consulting Engineers
Format: Book
Published: Geneva FIDIC 1999
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-335769
020 # # |a 2884320210 
040 # # |a ITMB 
090 0 0 |a TH425  |b .C66 1999 
245 1 1 |a Conditions of contract for EPC/turnkey projects 
260 # # |a Geneva  |b FIDIC  |c 1999 
300 # # |a [130] p.  |c 30 cm 
650 # 0 |a Construction contracts 
650 # 0 |a Buildings  |x Specifications 
710 1 # |a International Federation of Consulting Engineers 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=335769 
964 # # |c BOK  |d 01 
998 # # |a 00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##c003.5.1||