Computer integrated construction project scheduling

Written in a style that is meant to be open and inviting to the reader with shorter paragraphs and interesting illustrations, this book provides a single source comprehensive examination of construction project scheduling. Content begins with introducing concepts of the construction industry to prov...

Full description

Saved in:
Bibliographic Details
Main Author: Buttelwerth, John (Author)
Format: Book
Language:English
Published: Upper Saddle River, N.J Pearson/Prentice Hall 2005
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a2200000 a 4501
001 wils-332899
005 20201027195054
008 t2005 NJU ag| |#001 ##eng#D
020 # # |a 0131114654  |q paperback 
020 # # |a 9780131114654  |q paperback 
040 # # |a DLC  |b eng  |d ITMB  |e rda 
041 0 # |a eng 
090 0 0 |a TH438.4  |b .B88 2005 
100 1 # |a Buttelwerth, John  |e author 
245 1 1 |a Computer integrated construction project scheduling  |c John Buttelwerth 
264 # 1 |a Upper Saddle River, N.J  |b Pearson/Prentice Hall  |c 2005 
300 # # |a xiv, 482 pages :  |b illustrations  |c 28 cm 
336 # # |a text  |2 rdacontent 
337 # # |a unmediated  |2 rdamedia 
338 # # |a volume  |2 rdacarrier 
500 # # |a 17 folded schedules and drawings included at the back of the book 
500 # # |a Includes index 
520 # # |a Written in a style that is meant to be open and inviting to the reader with shorter paragraphs and interesting illustrations, this book provides a single source comprehensive examination of construction project scheduling. Content begins with introducing concepts of the construction industry to provide the necessary framework and background, then fully discusses planning and scheduling topics in detail. It offers extensively reviewed coverage on the most current version of SureTrak Software, thorough coverage of manual network diagramming and CPM calculations, and has built into it a capstone project. The book includes an abundance of real world examples of numerous scheduling exercises-including 17 pages of full-size drawings and schedules that are part of the exercises. Additionally, the information is presented modularly in such a way that it can be customized to fit any learning situation. Covers planning and scheduling including the determination of project activities, logic, and durations; drawing precedence network diagrams and manually calculating CPM schedules; creating and updating computer-generated schedules and schedule reports. Well suited to be used as a guide or reference by construction practitioners such as Project managers, Superintendents, and Construction managers. 
650 # 0 |a Building  |x Data processing  |x Superintendence 
650 # 0 |a Production scheduling  |x Data processing 
700 0 # |e author 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=332899 
964 # # |c BOK  |d 01 
998 # # |a 00264#1a002.8.2||00264#1b002.8.4||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||00500##a002.17.2||01500##a002.17.2||00520##a007.2||00520##b007.2||