Life-cycle costing using activity-based costing and Monte Carlo methods to manage future costs and risks
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
Hoboken, N.J.
Wiley
2003
|
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000n a2200000 a 4501 | ||
---|---|---|---|
001 | wils-298564 | ||
020 | # | # | |a 0471358851 |
090 | 0 | 0 | |a HD47 |b .E58 2003 |
100 | 1 | # | |a Emblemsv?ag, Jan |
245 | 1 | 1 | |a Life-cycle costing |b using activity-based costing and Monte Carlo methods to manage future costs and risks |c Jan Emblemsv?ag |
260 | # | # | |a Hoboken, N.J. |b Wiley |c 2003 |
300 | # | # | |a xvi, 320 p. |b ill. |c 24 cm |
504 | # | # | |a Includes bibliographical references and index |
650 | # | 0 | |a Life cycle costing |
650 | # | 0 | |a Costs, Industrial |
650 | # | 0 | |a Risk management |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=298564 |
964 | # | # | |c BOK |d 01 |
040 | # | # | |a Shah Alam |