Managing the construction process estimating, scheduling, and project control

Saved in:
Bibliographic Details
Main Author: Gould, Frederick E. 1954-
Format: Book
Published: Upper Saddle River, N.J. Prentice Hall 2002
Edition:2nd ed
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-295574
020 # # |a 0130604062 
090 0 0 |a TH438  |b .G68 2002 
100 1 # |a Gould, Frederick E.  |c 1954- 
245 1 1 |a Managing the construction process  |b estimating, scheduling, and project control  |c Frederick E. Gould 
250 # # |a 2nd ed 
260 # # |a Upper Saddle River, N.J.  |b Prentice Hall  |c 2002 
300 # # |a xiv, 393 p.  |b ill.  |c 25 cm 
504 # # |a Includes bibliographical references and index 
650 # 0 |a Building  |x Superintendence 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=295574 
964 # # |c BOK  |d 01 
040 # # |a Shah Alam