Construction scheduling with Primavera Enterprise

Saved in:
Bibliographic Details
Main Author: Marchman, David A
Other Authors: Anderson, Terry Lee 1946-
Format: Book
Published: Australia Delmar Learning [2003]
Edition:Second edition
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-293986
005 20185484158
020 # # |a 0766828611 
040 # # |a UiTM  |b eng  |c UiTM  |e rda 
090 0 0 |a TH438.4  |b .M37 2003 
100 1 # |a Marchman, David A 
245 1 1 |a Construction scheduling with Primavera Enterprise  |c David A. Marchman and Terry L. Anderson 
250 # # |a Second edition 
264 # 1 |a Australia  |b Delmar Learning  |c [2003] 
264 # 4 |c ©2003 
300 # # |a xiii, 375 pages  |b illustrations  |c 28 cm 
336 # # |a text  |b txt  |2 rdacontent 
337 # # |a unmediated  |b n  |2 rdamedia 
338 # # |a volume  |b nc  |2 rdacarrier 
500 # # |a Includes index 
650 # 0 |a Building  |x Computer programs  |x Superintendence 
650 # 0 |a Production scheduling  |x Computer programs 
700 1 # |a Anderson, Terry Lee  |d 1946- 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=293986 
998 # # |a 00250##a002.5.2||00250##b002.5.3||00264#1a002.8.2||00264#1b002.8.4||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||00500##a002.17.2||