Construction scheduling, cost optimization, and management a new model based on neurocomputing and object technologies

Saved in:
Bibliographic Details
Main Author: Adeli, Hojjat
Other Authors: Karim, Asim
Format: Book
Published: London Spon Press 2001
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-274661
020 # # |a 041524417X 
090 0 0 |a TH438.4  |b .A33 2001 
100 1 # |a Adeli, Hojjat 
245 1 1 |a Construction scheduling, cost optimization, and management  |b a new model based on neurocomputing and object technologies  |c Hojjat Adeli, Asim Karim 
260 # # |a London  |b Spon Press  |c 2001 
300 # # |a xvi, 320 p.  |b ill.  |c 26 cm 
504 # # |a Includes bibliographical references and index 
650 # 0 |a Construction industry  |x Management 
650 # 0 |a Building  |x Cost control 
700 1 # |a Karim, Asim 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=274661 
964 # # |c BOK  |d 01 
040 # # |a Shah Alam 
998 # # |a 00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||