Maintenance Planning, Scheduling, and Coordination
Well-planned, properly scheduled, and effectively communicated jobs accomplish more work, more efficiently, and at a lower cost. This work will disturb operations less frequently, and be accomplished with higher quality, greater job satisfaction, and higher organisational morale than jobs performed...
Saved in:
Main Authors: | , |
---|---|
Format: | Book |
Language: | English |
Published: |
New York
Industrial Press
2001
©2001 |
Subjects: | |
Online Access: | Click Here to View Status and Holdings. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000cam#a2200000#i#4501 | ||
---|---|---|---|
001 | wils-268505 | ||
005 | 2024222101828 | ||
008 | 240322t2001 NYU ag# ##001 |#eng#D | ||
020 | # | # | |a 9780831131432 |q hardback |
020 | # | # | |a 0831131438 |q hardback |
040 | # | # | |a DLC |b eng |d UiTM |e rda |
041 | 0 | # | |a eng |
090 | 0 | 0 | |a TS176 |b .N96 2001 |
100 | 1 | # | |a Nyman, Don |e author |
245 | 1 | 0 | |a Maintenance Planning, Scheduling, and Coordination |c Don Nyman and Joel Levitt |
264 | # | 1 | |a New York |b Industrial Press |c 2001 |
264 | # | 1 | |c ©2001 |
300 | # | # | |a xx, 228 pages |b illustrations |c 23 cm |
336 | # | # | |a text |2 rdacontent |
337 | # | # | |a unmediated |2 rdamedia |
338 | # | # | |a volume |2 rdacarrier |
500 | # | # | |a Includes index |
520 | # | # | |a Well-planned, properly scheduled, and effectively communicated jobs accomplish more work, more efficiently, and at a lower cost. This work will disturb operations less frequently, and be accomplished with higher quality, greater job satisfaction, and higher organisational morale than jobs performed without proper preparation. The book focuses on and deals specifically with the preparatory tasks that lead to effective utilisation and application of maintenance resources. It is a vital training document for planners, an educational document for those to whom planners are responsible, and a valuable guide for those who interface with the planning and scheduling function and are dependent upon the many contributions of planning and scheduling operational excellence. |
650 | # | 0 | |a Production management |
650 | # | 0 | |a Product life cycle |
700 | 1 | # | |a Levitt, Joel |d 1952- |e author |
856 | 4 | 0 | |z Click Here to View Status and Holdings. |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=268505 |
964 | # | # | |c BOK |d 01 |
998 | # | # | |a 00264#1a002.8.2||00264#1b007.2||01264#1a002.8.2||01264#1b007.2||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||00500##a002.17.2||00520##a007.2||00520##b007.2|| |