Specification for the construction of slurry trench cut-off walls as barriers to pollution migration

Saved in:
Bibliographic Details
Format: Unknown
Published: London Thomas Telford 1999
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-263332
020 # # |a 0727726250 
020 # # |a 9780727726254 
040 # # |a GATT  |d ITMB 
090 0 0 |a TD195  |b .S64 1999 
245 0 0 |a Specification for the construction of slurry trench cut-off walls  |b as barriers to pollution migration 
260 # # |a London  |b Thomas Telford  |c 1999 
300 # # |a 1.v. [various pagings]  |b ill.  |c 25 cm 
650 # 0 |a Concrete walls  |x Construction and design 
650 # 0 |a Hazardous substances  |x Environmental aspects 
650 # 0 |a Slurry trench construction 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=263332 
964 # # |c BOK  |d 01 
998 # # |a 00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||