Liquidated damages and extensions of time in construction contracts

Saved in:
Bibliographic Details
Main Author: Eggleston, Brian
Format: Book
Published: Oxford Blackwell Scientific Publications 1992
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-232062
020 # # |a 0632032952 
090 0 0 |a KD1641  |b E33 
100 1 # |a Eggleston, Brian 
245 1 1 |a Liquidated damages and extensions of time in construction contracts  |c Brian Eggleston 
260 # # |a Oxford  |b Blackwell Scientific Publications  |c 1992 
300 # # |a xiv, 306p.  |c 23cm 
500 # # |a Includes bibliographical refereces and index 
650 # 0 |a Construction contracts  |z Great Britain 
650 # 0 |a Breach of contract  |z Great Britain 
650 # 0 |a Damages  |z Great Britain 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=232062 
964 # # |c BOK  |d 01 
040 # # |a Shah Alam 
998 # # |a 00260##a002.17.2||00260##b002.17.2||00260##c002.17.2||00300##a002.17.2||00300##c002.17.2||00500##a002.17.2||