Liquidated damages and extensions of time in construction contracts

Saved in:
Bibliographic Details
Main Author: Eggleston, Brian
Format: Unknown
Published: Oxford Blackwell Science 1997 (1999 printing)
Edition:2nd ed
Subjects:
Online Access:Click Here to View Status and Holdings.
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000n a2200000 a 4501
001 wils-194306
020 # # |a 0632042133 
040 # # |a UKM  |d ITMB 
090 0 0 |a KD1641  |b .E34 1997 
100 1 # |a Eggleston, Brian 
245 1 0 |a Liquidated damages and extensions of time in construction contracts  |c Brian Eggleston 
250 # # |a 2nd ed 
260 # # |a Oxford  |b Blackwell Science  |c 1997 (1999 printing) 
300 # # |a vi, 337 p.  |b ill.  |c 24 cm 
504 # # |a Includes bibliographical and index 
650 # 0 |a Breach of contract  |z Great Britain 
650 # 0 |a Construction contracts  |z Great Britain 
856 4 0 |z Click Here to View Status and Holdings.  |u https://opac.uitm.edu.my/opac/detailsPage/detailsHome.jsp?tid=194306 
964 # # |c D40  |d 01 
998 # # |a 00250##a002.5.2||00260##a002.8.2||00260##b002.8.4||00260##c002.7.6||00300##a003.4.1||00300##b003.6.1||00300##c003.5.1||